Haydarpasa Bridge

The Haydarpaşa Bridge project, which was carried out in Istanbul in 2020, aims to strengthen the city’s transportation infrastructure and connect the two sides of the Bosphorus. In this important project, KKC Marmaray Ordinary Partnership, which undertook the construction of the bridge, served as the main contractor company, while Örtaş Çelik San. Tic. A.Ş. was selected as the subcontractor company for the steel construction works.

Constructed using steel construction structures with a total capacity of 1500 tons, the Haydarpaşa Bridge aims to provide a solution to Istanbul’s transportation problems. The bridge’s modern design and solid structure aim to relieve the city’s traffic and ensure the safety of those traveling on the Bosphorus.

The Haydarpaşa Bridge was designed as an important transportation point connecting the two sides of the Bosphorus in Istanbul. The project is of great importance, especially in terms of reducing traffic congestion and shortening travel times. The solid structure of the steel structures guarantees that the bridge will be long-lasting and resistant to high-capacity vehicle passages. In addition, the modern engineering techniques used in the construction of the bridge prioritize both structural safety and aesthetic visuality. Örtaş Çelik San. Tic. A.Ş. has ensured that the Haydarpaşa Bridge makes a significant contribution to Istanbul’s transportation infrastructure with its meticulous work and quality production on the project.

  • Location: Istanbul
  • Year: 2020
  • Contractor Company: KKC Marmaray Adi Ortaklığı
  • Sub-Contractor Company: Örtaş Çelik San. Tic. A. Ş.
  • Project Name: Haydarpaşa Bridge
  • Capacity: 1500 Tons