TRNC Sea Passage Transmission Line
The TRNC Sea Passage Transmission Line project is an important infrastructure project carried out in the TRNC in 2014. This project includes the construction of a sea passage transmission line, which is of vital importance for water supply and transmission. It was initiated by the General Directorate of State Hydraulic Works as the main employer, and the contractor company was Sigur Ros – Kalyon Partnership, and the subcontractor company was Örtaş Çelik San. Tic. A.Ş.
The TRNC Sea Passage Transmission Line, which was constructed using steel construction structures with a total capacity of 2500 tons, was designed to meet the water needs of the TRNC and ensure the safe transmission of water. The project aims to facilitate the access of the local people to water by ensuring the efficient transportation and distribution of water and to ensure the sustainability of water resources.
- Location: TRNC
- Year: 2014
- Main Employer: General Directorate of State Hydraulic Works
- Contractor Company: Sigur Ros – Kalyon Partnership
- Sub-Contractor Company: Örtaş Çelik San. Tic. A. Ş.
- Project Name: TRNC Sea Passage Transmission Line
- Capacity: 2500 Tons